Choice is only useful when it is free: the CompTIA CDIA+ Certification materials come as PDF, software and App versions at LatestCram, and you select whichever matches your life rather than the one a vendor pushes.
CompTIA 225-030 Exam Overview:
| Certification Vendor: | CompTIA |
|---|---|
| Exam Name: | CDIA+ (Certified Document Imaging Architect) Certification |
| Exam Number: | 225-030 |
| Exam Price: | USD 258 |
| Available Languages: | English |
| Certificate Validity Period: | Lifetime for certifications earned on or before 2010-12-31; 3 years for certifications earned thereafter (historical policy) |
| Related Certifications: | CDIA+ (Certified Document Imaging Architect) |
| Exam Format: | Multiple-choice |
| Exam Duration: | 90 minutes |
| Real Exam Qty: | 85 |
| Passing Score: | 700/900 |
| Sample Questions: | ![]() |
| Exam Way: | Pearson VUE or Prometric testing centers (historical delivery model); onsite proctored examination. |
| Pre Condition: | No mandatory prerequisite exam. Recommended experience in document imaging, records management, workflow automation, and enterprise content management solutions. |
| Official Syllabus URL: | https://www.comptia.org/certifications |
CompTIA 225-030 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Recommend Solution | 16% | - Develop solution recommendations
|
| Analyze Business Process | 22% | - Evaluate existing processes
|
| Gather Business Requirements | 25% | - Identify business objectives
|
| Plan for Implementation | 13% | - Implementation planning
|
| Design Solution | 24% | - Create document imaging architecture
|
CompTIA CDIA+ Certification Prep: Three Versions, One Verified Bank
- Recommend Solution (16%)
- Design Solution (24%)
- Analyze Business Process (22%)
CompTIA CDIA+ Certification Sample Questions:
Assuming an average image size of 105 KB, a 700 MB CD -R contains how many images?
- A. 10,826
- B. 15,020
- C. 7,580
- D. 6,826
Correct Answer: D 🗳️
All of the following are major factors in meeting legal compliances with a Document Management
System (DMS) EXCEPT:
- A. audit trails.
- B. retention periods.
- C. service level agreements.
- D. alterability requirements.
Correct Answer: C 🗳️
A system implementation is complete when which of the following has occurred?
- A. All users have been trained and are able to use the system.
- B. The system administrators have reviewed the system and accepted responsibility for it.
- C. The completion standards defined in the agreement have been met and the system performs as described.
- D. All system components have been installed and the system runs well.
Correct Answer: C 🗳️
The Project Manager is responsible for all of the following EXCEPT:
- A. selecting users for acceptance testing.
- B. creating a work breakdown structure.
- C. estimating task duration.
- D. managing scope.
Correct Answer: A 🗳️
A Document Management System (DMS) has been implemented and is entering the acceptance testing phase.The test scenario includes indexing with OCR. Many of the documents are of poor quality and have handwritten notes. Before going live with the new DMS, what test should be performed?
- A. Select 10% of the handwritten notes for testing. If this sample is acceptable, assume that the system will function properly.
- B. Randomly select computer generated text from poor quality documents to test if OCR accuracy is high enough to find exact work or documents.
- C. Proceed with implementation. The only way to determine if the system works is to begin using it.
- D. Randomly select handwritten notes from good quality documents to test if OCR accuracy is high enough to find exact work or documents.
Correct Answer: B 🗳️
Viewing page 1 out of 51 pages.
Viewing questions 1-5 out of 255 questions.








