A fully updated 2023 CSCP Exam Dumps exam guide from training expert LatestCram


Important CSCP Exam Details

To earn the CSCP certification, candidates must pass one exam that covers 3 modules. This test comprises 150 questions, 130 of which are operational, and an additional 20 to complete the pretest options. Overall, you will get a maximum of 3.5 hours to complete this exam. It should be stated that the pretest questions never contribute to the final score in any way. Instead, they serve a critical statistical role to help with creating future exams. This is also a simple reason why they are randomly distributed throughout the CSCP test. However, you must attempt all the questions within the given time limit. Scoring on the CSCP is done on a scale of 200-350. So, anytime you score 300 points and above, you will have satisfied the requirement for attaining the CSCP certification. Any score of 299 points and below will earn you a “Fail” status, and you may have to retake this exam.


CSCP Exam Requirements

To be eligible for the CSCP exam from ASCM, candidates must have already fulfilled one of the following requirements:

  • Should have a Bachelor's degree or similar training of an international equivalent;
  • Have earned 3 years of business experience;
  • Must have an active CFPIM, CPIM, SCOR-P, CPM, CSM, or CPSM certification.

 

NEW QUESTION 282
Potential customers of a company's new product have tight tolerance requirements. The company plans to purchase a critical component. To meet customer requirements, the company should first:

  • A. bring manufacturing of the critical component in-house.
  • B. certify the supplier of the component.
  • C. develop an alternate source of supply.
  • D. implement statistical process control for the component.

Answer: B

 

NEW QUESTION 283
Which of the following strategies is most appropriate for managing unknown risks in a global supply chain?

  • A. Vertical integration
  • B. Technology integration with suppliers
  • C. Investing in redundancy
  • D. Strengthening supplier relationships

Answer: C

Explanation:
Section: Implementation and Operations

 

NEW QUESTION 284
Which of the following performance measurements identifies supply chain flexibility?

  • A. Customer order fill rate greater than 90 percent
  • B. Reduction in order fulfillment lead time in a given period
  • C. Percent of unplanned orders that can be shipped within the same week
  • D. Total days of inventory in supply goods

Answer: B

 

NEW QUESTION 285
Continuous improvement is best described as:

  • A. a never-ending effort by the management team to reduce cycle time.
  • B. a never-ending effort to expose and eliminate root causes of problems.
  • C. identifying and implementing big-step improvements within a process.
  • D. a process in which a supplier commits to replenishing inventory based on demand without receiving replenishment orders.

Answer: B

 

NEW QUESTION 286
What are the steps in the supplier relationship process?

  • A. Source, procure, fulfill, manage
  • B. Measure, procure, fulfill, model
  • C. Measure, fulfill, document, model
  • D. Source, document, manage

Answer: A

Explanation:
Section: Supply Chain Strategy, Design, and Compliance

 

NEW QUESTION 287
All of the following are types of customers EXCEPT:

  • A. past due customer
  • B. lost customer
  • C. loyal customer
  • D. vulnerable customer
  • E. noncustomer

Answer: A

 

NEW QUESTION 288
Data concerning customers can be derived from all of the following sources EXCEPT:

  • A. service representatives
  • B. purchased data
  • C. distribution points
  • D. shipping and receiving
  • E. transaction records

Answer: D

Explanation:
Module 4: Using Information Technology to Enable Supply chain management

 

NEW QUESTION 289
Which term best corresponds to the distribution side of the supply chain?

  • A. downstream
  • B. North Star
  • C. value stream
  • D. mainstream
  • E. upstream

Answer: A

 

NEW QUESTION 290
A company's supply chain depends heavily on sourcing from international suppliers. Conditions increasingly threaten supply continuity. Which of the following actions is most appropriate?

  • A. Source from domestic suppliers.
  • B. Spread logistics across multiple carriers.
  • C. Conduct a risk assessment.
  • D. Carry additional safety stock.

Answer: C

 

NEW QUESTION 291
Which of the following is a characteristic of a market responsive supply chain?

  • A. meets predictable demand efficiently at the lowest possible cost
  • B. maintains high utilization rate with regards to manufacturing
  • C. suppliers are selected primarily to reduce cost
  • D. its product design strategy utilizes modular design to allow for postponement ofdifferentiation in products

Answer: D

 

NEW QUESTION 292
Which of the following characteristics are reflective of a resilient supply chain?

  • A. Proactive in anticipating events and slow recovery from undesirable events
  • B. Reactive in anticipating events and fast recovery from undesirable events
  • C. Proactive in anticipating events and fast recovery from undesirable events
  • D. Reactive in anticipating events and slow recovery from undesirable events

Answer: C

 

NEW QUESTION 293
Which of the following measures of a supply chain performance is most desirable from a stockholder perspective?

  • A. Time to market of new products
  • B. Velocity and return on assets (ROA)
  • C. Diversity of sales channels
  • D. Lean manufacturing performance

Answer: D

 

NEW QUESTION 294
Physically efficient supply chains have all of the following characteristics EXCEPT:

  • A. maintain high average utilization rate
  • B. supply predictable demand efficiently at the lowest possible cost
  • C. suppliers are selected primarily for speed, flexibility, and quality
  • D. maximize performance and minimize cost
  • E. generate high turns and minimize inventory

Answer: C

 

NEW QUESTION 295
All of the following are parameters of the EOQ EXCEPT:

  • A. ordering cost
  • B. holding cost
  • C. demand
  • D. item purchase price
  • E. order quantity

Answer: E

 

NEW QUESTION 296
Which of these supply chain types correspond to the phrase "source centrally, bought locally"?

  • A. customer-centric
  • B. process-centric
  • C. product-centric
  • D. functional-centric

Answer: D

 

NEW QUESTION 297
......