NEW QUESTION # 11
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.
- A. Leveraging the web-based planning capability
- B. Leveraging the functionality of SAP Workzone
- C. Using Driver-Based planning
- D. Using Microsoft Excel planning views
Answer: A,D
NEW QUESTION # 12
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Target Service Level
- B. Holding Cost Percentage
- C. Transportation Lead Time Error CV
- D. Minimum Lot Size
Answer: A,D
NEW QUESTION # 13
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Configure at most two input key figures on the same planning level in a key figure calculation.
- B. Specify a planning horizon in the planning area for each level of the assigned time profile.
- C. Configure at least one calculated key figure for the planning area.
- D. Assign the compound master data type and its component master data types.
Answer: B,D
NEW QUESTION # 14
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note:
There are 2 correct answers to this question.
- A. Add a new time profile level to the time profile.
- B. Change the numbering hierarchy of the period IDs in the time profile.
- C. Change the description of the attributes in the time profile.
- D. Change the past and future horizon of the levels in the time profile.
Answer: C,D
NEW QUESTION # 15
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Simulation Chart Types
- B. Geographic Chart Types
- C. Comparison Chart Types
- D. Trend Chart Types
- E. Seasonal Chart Types
Answer: C,D,E
NEW QUESTION # 16
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.
- A. Enter the product family to which the new product belongs
- B. Copy the launch dimension from the reference product to the new product
- C. Enter the Phase-out Start Date and Phase-out End Date
- D. Create planning objects for new combinations in the app
Answer: B,D
NEW QUESTION # 17
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for system editable key figures.
- B. Fixing is possible for manually editable key figures.
- C. Fixing is possible for a certain quantity of a key figure value.
- D. Fixing is possible for a certain period, including all child values in the hierarchy.
Answer: A,D
NEW QUESTION # 18
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.
- A. Merging two locations into a new location
- B. Changing customer sources and reassigning customers to new DCs
- C. Removing outliers from the sales history of a reference product before transferring its sales to a new product
- D. Using the realignment run to identify obsolete data
Answer: A,B
NEW QUESTION # 19
What function would you use to configure a year-to-date calculation?
- A. Cumulative Aggregation
- B. Rolling Aggregation
- C. Dynamic Rolling Aggregation
- D. Last Period Aggregation
Answer: A
NEW QUESTION # 20
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Supply Heuristics in SAP IBP for sales and operations
- B. Demand Sensing with Gradient Boosting (Full)
- C. Charts creation in SAP Supply Chain Control Tower
- D. Decoupling Points determination in SAP IBP for demand-driven replenishment
Answer: A,B
NEW QUESTION # 21
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Planning results can be generated faster by the optimizer.
- B. Push and Pull production models are used by the optimizer.
- C. Finite heuristics can achieve demand prioritization and pegging.
- D. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
Answer: B,C
NEW QUESTION # 22
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID5" ="$$PERIODID5CU$$...)
- B. IF("PERIODID4" ="$$PERIODID4CU$$...)
- C. IF("PERIODID2" ="$$PERIODID2CU$$...)
- D. IF("PERIODID3" ="$$PERIODID3CU$$...)
Answer: B
NEW QUESTION # 23
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note: There are 2 correct answers to this question.
- A. SAP IBP ribbon extension
- B. Changing the layout of the master data workbooks
- C. Changing the member names
- D. Changing the entries from the Name Manager
Answer: A,B
NEW QUESTION # 24
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Create additional test planning areas in the production system to support cutover needs.
- B. Set up a three-tier landscape using transport, starting from the development system to test and production.
- C. Create additional planning areas in the test system to support training needs.
- D. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
Answer: B,D
NEW QUESTION # 25
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Adjusted transport receipts
- B. Aggregated constraints
- C. Maximum lot size
- D. Minimum lot size
- E. Transportation lead times
Answer: A,C,E
NEW QUESTION # 26
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Purge Key Figure Data
- B. Purge Master Data
- C. Create Time Periods for Time Profiles
- D. Purge Non-Conforming Data
Answer: A,B
NEW QUESTION # 27
You have to be logged on to two separate SAP IBP tenants.What can help you differentiate the appearance of their user interfaces?Note: There are 2 correct answers to this question.
- A. Having a different set of tiles in the Home group of apps.
- B. Setting a separate theme for the Home page in the Web UI.
- C. Add the system name and tenant information from the About section to the Home page.
- D. Defining a different default planning area via the User Preferences.
Answer: B,C
NEW QUESTION # 28
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are
2 correct answers to this question.
- A. The key figure is calculated and all editable.
- B. The key figure is stored and system editable.
- C. The key figure is stored and all editable.
- D. The key figure is calculated and system editable.
Answer: C
NEW QUESTION # 29
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.
- A. Identify inventory items that require closer attention.
- B. Choose time-independent key figures as segmentation measures.
- C. Substitute missing values in case of sporadic demands.
- D. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
Answer: A,B
NEW QUESTION # 30
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
- B. This application job can be run for multiple time profiles at once.
- C. The assigned Planning Area must be active.
- D. A time profile has to be activated so that the application job can proceed.
Answer: A
NEW QUESTION # 31
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the required planning level master data exists for a subset of input key figures.
- B. It checks whether the sourcing in the Production Source Item Master Data type exists.
- C. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- D. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- E. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
Answer: A,C,E