[2021] Use Valid New Free C-TS422-2020 Exam Dumps & Answers [Q40-Q55]

Share

[2021] Use Valid New Free C-TS422-2020 Exam Dumps & Answers

C-TS422-2020 Braindumps PDF, SAP C-TS422-2020 Exam Cram


SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
Introduction to SAP S/4HANA Supply Chain PlanningOutline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Process Orders in SAP S/4HANACharacterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Capacity Planning in SAP S/4HANAOutline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4230 (SAP S/4HANA 2020)

8% - 12%
Master Data in SAP S/4HANAIdentify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4210 (SAP S/4HANA 2020)

> 12%
Demand Management in SAP S/4HANAExplain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Advanced Planning in SAP S/4HANAOutline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

> 12%
Production Orders in SAP S/4HANADetermine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4225 (SAP S/4HANA 2020)

> 12%
Introduction to SAP S/4HANA Production PlanningOutline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Material Requirements Planning in SAP S/4HANASelect and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

8% - 12%
Lean Manufacturing in SAP S/4HANAIdentify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

8% - 12%


C-TS422-2020 Exam Certification Details:

Sample Questions: SAP C-TS422-2020 Exam Sample Question
Cut Score:56%
Level:Associate
Exam:80 questions
Duration:180 mins
Languages:English

 

NEW QUESTION 40
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Pick/pack time
  • B. Queue time
  • C. Move time
  • D. Float before production
  • E. Wait time

Answer: A,B,E

 

NEW QUESTION 41
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Backflushing
  • B. Transfer Order
  • C. Kanban
  • D. Picking list

Answer: D

 

NEW QUESTION 42
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The assigned routing must be a rate routing.
  • B. The assigned routing must NOT have alternative sequences.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The lot size range must be within the lot-size range of the assigned routing.
  • E. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.

Answer: C,D,E

 

NEW QUESTION 43
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Make-to-order production (20)
  • B. Make-to-stock production (10)
  • C. Planning without final assembly (50)
  • D. Planning with final assembly (40)

Answer: D

 

NEW QUESTION 44
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Sales Order BOM
  • B. Class BOM
  • C. Functional Location BOM
  • D. Work Center BOM

Answer: A,C

 

NEW QUESTION 45
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Make-to-order production (20)
  • B. Planning with final assembly (40)
  • C. Planning at assembly level (70)
  • D. Planning without final assembly (50)

Answer: D

 

NEW QUESTION 46
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To provide timely updates of inventory management for the staged components
  • C. To reduce the totalproduction lead time for along production line
  • D. To stage different components for a production line simultaneously

Answer: A,B

 

NEW QUESTION 47
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by product costing to determine how costs are rolled up.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by ATP to determine the priority of alternative components.

Answer: A,B

 

NEW QUESTION 48
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Assign planned orders manual lying the planning table.
  • B. Run PP/DS heuristics for repetitive manufacturing.
  • C. Run MRP with quotaarrangement.
  • D. Run MRP with automatic selection of production version.

Answer: B,C

 

NEW QUESTION 49
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Material Requirements Planning (MRP)
  • B. Integrated Business Planning (IBP)
  • C. Supply Chain Management (SCM)
  • D. Capacity Requirements Planning (CRP)

Answer: B,C

 

NEW QUESTION 50
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Planned order
  • C. Stock transport order
  • D. Purchase requisition
  • E. Production order

Answer: A,B,D

 

NEW QUESTION 51
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Select an alternative mode on a resource.
  • C. Form optimum sequences to reduce setup times.
  • D. Execute a new production planning run.
  • E. Reduce the planning window.

Answer: A,B,C

 

NEW QUESTION 52
Where do you maintain the duration of a producton operation?

  • A. Routing
  • B. Bill of material (BOM)
  • C. Material master
  • D. Work instructions

Answer: A

 

NEW QUESTION 53
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Reduction of associated capacity requirements
  • B. Material staging for next order in sequence
  • C. Archiving of documents for assembly scrap
  • D. Posting of production costs to the production cost collector
  • E. Posting of goods receipt for the product

Answer: A,D,E

 

NEW QUESTION 54
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.

  • A. Safety stock
  • B. Purchase orders
  • C. Maximum stock level
  • D. Lot size

Answer: A,D

 

NEW QUESTION 55
......

Feel SAP C-TS422-2020 Dumps PDF Will likely be The best Option: https://www.latestcram.com/C-TS422-2020-exam-cram-questions.html