Knowledge shapes career and lifestyle — and one useful certificate influences your future. Get better acquainted with the Autodesk Certified Professional in BIM Management for Building Design test engine at LatestCram: 59 practice questions for the BIM_MGT_101 exam.
Autodesk BIM_MGT_101 Exam Overview:
| Certification Vendor: | Autodesk |
|---|---|
| Exam Name: | Autodesk Certified Professional in BIM Management for Building Design |
| Exam Number: | BIM_MGT_101 |
| Available Languages: | English |
| Real Exam Qty: | 45-60 |
| Certificate Validity Period: | 3 years |
| Exam Duration: | 120 minutes |
| Passing Score: | Pass/Fail (passing score not publicly disclosed) |
| Exam Format: | Multiple choice (multiple-answer), Multiple choice (single-answer), Matching / object association, Selected-response, Drag and drop |
| Exam Price: | USD 200 |
| Related Certifications: | Autodesk Certified Professional in Revit for Architectural Design Autodesk Certified Professional in Civil 3D for Infrastructure Design |
| Sample Questions: | ![]() |
| Exam Way: | Available as an online proctored exam (OnVUE) or at an authorized Pearson VUE test center. |
| Pre Condition: | No mandatory prerequisite. Recommended: 4+ years of BIM administration experience, approximately 2,000+ hours using Autodesk BIM software, familiarity with Autodesk AEC authoring tools, Autodesk Forma (formerly Autodesk Construction Cloud), model coordination, BIM Execution Plans, point clouds, and BIM standards such as ISO 19650. |
| Official Syllabus URL: | https://www.autodesk.com/certification/all-certifications/bim-building-design-professional |
Autodesk BIM_MGT_101 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Collaboration Process | 36% | - Coordinate multidisciplinary models
|
| Corporate Standards and Documentation | 16% | - Develop BIM documentation and training
|
| Data Management | 20% | - Manage project data
|
| Project Needs Assessment | 28% | - Establish project workflows
|
Autodesk Certified Professional in BIM Management for Building Design Exam FAQ — Succinct Answers
Upon successful payment, our system emails the Autodesk Certified Professional in BIM Management for Building Design study material automatically within about a minute, with 24/7 patient help if nothing arrives within 2 hours. If you fail the corresponding BIM_MGT_101 exam within 60 days of purchase, we refund the full amount: send a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam, processed within 7 days. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. Or exchange for two equal-value products free.
The Autodesk Certified Professional in BIM Management for Building Design blueprint spans 4 domains — including Data Management (20%), Corporate Standards and Documentation (16%), Project Needs Assessment (28%). Our experts analyze this outline and notice every little change; the complete outline above lists every subtopic.
The Autodesk Certified Professional in BIM Management for Building Design is Autodesk's certification exam for Autodesk Certified Professional, at the Professional level. One useful certificate can exert real influence on your future. Related credentials include Autodesk Certified Professional in Revit for Architectural Design, Autodesk Certified Professional in Civil 3D for Infrastructure Design.
USD 200 per attempt, Pass/Fail (passing score not publicly disclosed) to pass. Retakes cost the full fee — practice regularly with the 59 practice questions for the BIM_MGT_101 exam at LatestCram before you book.
120 minutes for 45-60 questions. Regular timed practice in the LatestCram engine makes the format familiar long before exam day.
No mandatory prerequisite. Recommended: 4+ years of BIM administration experience, approximately 2,000+ hours using Autodesk BIM software, familiarity with Autodesk AEC authoring tools, Autodesk Forma (formerly Autodesk Construction Cloud), model coordination, BIM Execution Plans, point clouds, and BIM standards such as ISO 19650. Eligibility rules change over time, so verify the current requirements on the official page (official BIM_MGT_101 exam page) before registering.
Yes — under each kind of Autodesk Certified Professional in BIM Management for Building Design practice test we offer one free demo, including a real part of the content; look through it thoroughly before ordering. Purchases include 365 days of free updates by email; renew afterward at 50% off.
Autodesk Certified Professional in BIM Management for Building Design Sample Questions:
The BIM manager received a subcontractor's 3D model containing specialty equipment to be integrated into the federated model. Upon review, they observe that:
Many elements lack consistent object styles and category assignments.
Some components are modelled with excessive detail, affecting performance.
Embedded data does not follow the project's naming conventions outlined in the BEP.
What is the most appropriate next step when evaluating this geometry and content?
- A. Approve the model as-is to avoid delaying coordination and document the issues for review at the next quality-control milestone.
- B. Instruct the subcontractor to simplify geometry and reduce file size, even if some metadata and classifications are lost.
- C. Import the model into the coordination environment and apply view filters to hide excessive detail and inconsistencies.
- D. Review the model against content standards, document noncompliance, and request revisions aligned with agreed deliverable requirements.
Correct Answer: D 🗳️
Explanation: Only visible for LatestCram members. You can sign-up / login (it's free).
Refer to the exhibit.
A designer cannot see a 2x4 tile ceiling in the hallway area of their Reflected Ceiling Plan, but that same ceiling is visible in a 3D view. The 2x2 ceilings in the other rooms are visible in both views.
What are two possible reasons for this? (Select two.)
- A. A Plan Region with a higher cut level has been applied to that area.
- B. A View Filter has been applied for that ceiling type.
- C. Hide in View by Category was applied to that ceiling.
- D. A View Template has been assigned with ceilings category visibility off.
- E. The ceiling was inadvertently deleted.
Correct Answer: A,B 🗳️
Explanation: Only visible for LatestCram members. You can sign-up / login (it's free).
A BIM manager is running clash detection for the first time on a large retail project during the Design Development phase. After copying all the models to the coordination space on Autodesk Forma, the matrix shows no clashes among any of the models.
How should the BIM manager proceed?
- A. Add sheets to the publish settings and rerun the clash.
- B. Use the project as a case study for a firm-wide presentation.
- C. Continue forward on the project because there are no coordination issues.
- D. Verify the shared coordinates for each model and republish.
Correct Answer: D 🗳️
Explanation: Only visible for LatestCram members. You can sign-up / login (it's free).
A designer needs to add Area Lines in an Area Plan, but upon adding them, they receive a message stating that none of the created elements are visible.
Where can they check to resolve the issue?
- A. Detail Level
- B. Plan Region
- C. Visibility/Graphics
- D. Area Scheme
Correct Answer: C 🗳️
Explanation: Only visible for LatestCram members. You can sign-up / login (it's free).
During early coordination on a hospital project, the BIM manager runs a general clash detection between all models and generates over 3,000 clash results. Many are low-priority issues, such as wall-grid overlaps and minor duct-ceiling intersections. The project's clash matrix outlines only high-impact clashes between structural, MEP, and architecture in specific zones.
For the BIM manager, what is the most appropriate next step to align clash reporting with the project's coordination strategy?
- A. Share the full clash report with all project teams and instruct them to determine and resolve the issues they consider most important.
- B. Disable or relax selected non-critical clash rules within the detection software to temporarily reduce the total number of reported issues.
- C. Export the entire clash list into spreadsheet format so project managers can manually sort, review, and prioritize the items by trade.
- D. Apply the clash matrix to filter out low-priority clashes, adjust detection tolerances where appropriate, and produce reports for each discipline's scope.
Correct Answer: D 🗳️
Explanation: Only visible for LatestCram members. You can sign-up / login (it's free).
Viewing page 1 out of 12 pages.
Viewing questions 1-5 out of 59 questions.







1195 Customer Reviews

